The bridge will have two lanes in each direction plus an emergency lane and a dedicated lane for motorcycles. When scheduled to be completed on June 2009, the 5.4-kilometer bridge will be the first land link between the two islands and the longest bridge in Indonesia. The cable-stayed portion will have three spans with lengths 192 m, 434 m and 192 m. The total cost of the project, including connecting roads, has been estimated at 4.5 trillion rupiah (US$390 million).
The remaining works which is targated to be completed on June 2009 are :
- Approach bridge in between causeway and main bridge of Surabaya side
- Connecting road of Madura side.
Suramadu bridge have 4 main part of structures :
- Connecting road
- Causeway
- Main Bridge
CAUSEWAY
Upper Structure PCI Girder 36 spans of Surabaya side, 45 spans of Madura side with @ 45 m length.
Foundation : Steel Pipe D. 60 cm with average length 25 m of Surabaya side and 27 m of Madura side.